12th day at SSMC.
Today was tiring, have been staring at the computer for the whole day. I was supposed to do some calculations of data using Microsoft Excel's formula but before doing the calculations, I need to identify and categorize the data by the different wafer defect types.
However, not all data are categorized clearly in detail. Some of the data have their defect type stated in the description part but not all. Thus, those that have their defect type stated in the description column, I had an easier time in categorizing them.
On the other hand, most of the data were not clearly described and to confirm and check them, I had to, one by one, look for the individual files (using the Lot ID), open up the files and check the disposition. If the disposition doesn't state, then I need to check the pictures of the wafer.
Still, it's my 1st time identifying wafer defect types, it took me the whole day. And I still couldn't managed to finish it. Hope to finish it tomorrow.
3rd Year Student studying Diploma in Engineering with Business in Singapore Polytechnic. Currently attached to SSMC for 4 months ITP.
Wednesday, 31 October 2012
Tuesday, 30 October 2012
Week 3 - 30 Oct 2012 - Tue
11th day at SSMC.
Today finally got the software Tera Term, for creating the charts, installed onto my computer. I'm not quite sure if this 'Tera Term' is the one same as what I had encountered during Sensors Technology and Application practical lesson but things I've done using this 'Tera Term' is different from the one I had for my practical lesson. So, I guess, they should be different.
Anyway, I don't have much to post for today and I can only say that I have been trying to create trial chart for practice today. As there are certain requirements to be set up and create by other people before I can do the actual charts.
Besides, the grouping of points of the different areas for each measurement have to be reconsidered. We just realized that there are still things to be taken into considerations before we start to create the charts.
So, I guess I'm back to preparation stage.
I really do not have much to say so I think I will end here. Hope that tomorrow will have more things to share (but I pretty much doubt so).
Today finally got the software Tera Term, for creating the charts, installed onto my computer. I'm not quite sure if this 'Tera Term' is the one same as what I had encountered during Sensors Technology and Application practical lesson but things I've done using this 'Tera Term' is different from the one I had for my practical lesson. So, I guess, they should be different.
Anyway, I don't have much to post for today and I can only say that I have been trying to create trial chart for practice today. As there are certain requirements to be set up and create by other people before I can do the actual charts.
Besides, the grouping of points of the different areas for each measurement have to be reconsidered. We just realized that there are still things to be taken into considerations before we start to create the charts.
So, I guess I'm back to preparation stage.
I really do not have much to say so I think I will end here. Hope that tomorrow will have more things to share (but I pretty much doubt so).
Monday, 29 October 2012
Week 3 - 29 Oct 2012 - Mon
Start of the week again, 10th day at SSMC.
I have basically finish all the preparation for creating the charts. What's left is to wait for the IT technicians to installed the software into my computer and then I get to start creating charts. But of course, I have to learn to use the software as well.
Since most of the preparations are done, today, as a start, I did the 'Free Time Task' that was given to me last Thursday. (It's called free time task as Miss Pascale said to do it during my free time; when I had nothing to do.)
This 'Free Time Task' is to calculate, using the Microsoft Excel's formula, certain data for Miss Pascale. I am supposed to calculate the followings using Excel's formula to pick and calculate columns and rows of data:
I have explored Excel's formula and Help to decide which formula to use and finally had solved the task with 3 formula, 'DSUM', 'DCOUNT' and 'COUNTIFS'.
The 'COUNTIFS' formula, as I have mentioned in my previous post, I am familiar with it. Just have to select the right criteria ranges and the associated ranges and the result will be out.
Today, I have learnt 2 new formula, 'DSUM' and 'DCOUNT'. Both formula require database (list of related data), field (the column label used) and the criteria.
These are examples of the formula I had done today:
=DSUM('Output Qty'!$1:!1048576,"qty",N$1:O$2)
=DCOUNT('Output Qty'!1:1048576,"qty',Tabulations!M1:O2)
=COUNTIFS('Output Qty'!$B:$B,Tabulations!E$2,'Output Qty'!$S:$S,Tabulations!F$3,'Output Qty'!$X:$X,1)
Another point that I have learnt today. For criteria that do not want to include certain points, use something like "<>apple", then data that are apple will not be included in the calculations.
Like as I've mentioned in the starting of this post, I need to learn the software before I can create the charts and today, I had attended a training lesson on the basic steps of creating the charts.
I am looking forward to create the charts, of course, after the software is being installed in my computer first...
I have basically finish all the preparation for creating the charts. What's left is to wait for the IT technicians to installed the software into my computer and then I get to start creating charts. But of course, I have to learn to use the software as well.
Since most of the preparations are done, today, as a start, I did the 'Free Time Task' that was given to me last Thursday. (It's called free time task as Miss Pascale said to do it during my free time; when I had nothing to do.)
This 'Free Time Task' is to calculate, using the Microsoft Excel's formula, certain data for Miss Pascale. I am supposed to calculate the followings using Excel's formula to pick and calculate columns and rows of data:
I have explored Excel's formula and Help to decide which formula to use and finally had solved the task with 3 formula, 'DSUM', 'DCOUNT' and 'COUNTIFS'.
The 'COUNTIFS' formula, as I have mentioned in my previous post, I am familiar with it. Just have to select the right criteria ranges and the associated ranges and the result will be out.
Today, I have learnt 2 new formula, 'DSUM' and 'DCOUNT'. Both formula require database (list of related data), field (the column label used) and the criteria.
These are examples of the formula I had done today:
=DSUM('Output Qty'!$1:!1048576,"qty",N$1:O$2)
=DCOUNT('Output Qty'!1:1048576,"qty',Tabulations!M1:O2)
=COUNTIFS('Output Qty'!$B:$B,Tabulations!E$2,'Output Qty'!$S:$S,Tabulations!F$3,'Output Qty'!$X:$X,1)
Another point that I have learnt today. For criteria that do not want to include certain points, use something like "<>apple", then data that are apple will not be included in the calculations.
Like as I've mentioned in the starting of this post, I need to learn the software before I can create the charts and today, I had attended a training lesson on the basic steps of creating the charts.
I am looking forward to create the charts, of course, after the software is being installed in my computer first...
Thursday, 25 October 2012
Week 2 - 25 Oct 2012 - Thu
Ninth day at SSMC, last day of the week.
These few days I have been finding the Max and Min values for the particle count, air velocity for different areas. As for today, I've done the similar task for Ionization. Difference is, in ionization, there are 2 parameters and each parameter has both positive (+) and negative (-) measurements. The 2 parameters are Decay Time and Offset Voltage.
However, beside Max and Min, today had to find the Average and Range values too. Thus, the data to be calculated is quite a lot. The picture below shows how I had organised the values but I am not suppose to reveal any company data. So the picture only shows the format without any data values.
After which, I have also calculated Max and Min values for the particle counts for the other areas to cut down the total number of charts to be created.
And finally, after so many days of calculating the Max and Min values for all the possible areas, the total number to charts we will be creating is 48 charts. From previously 191 charts, we had managed to cut down to 48 charts, I feel very satisfied. (^^)
Today, I had explored Microsoft Excel's Macro functions. I have created, using the Macros, buttons (after being clicked) that will link me to another worksheet. Although, they (the Macros that I have created) are not very useful, I still feel very satisfied.
Today is only Thursday but is the last working day of the week. I have realized the importance of public holiday now. Lol... (^^)
These few days I have been finding the Max and Min values for the particle count, air velocity for different areas. As for today, I've done the similar task for Ionization. Difference is, in ionization, there are 2 parameters and each parameter has both positive (+) and negative (-) measurements. The 2 parameters are Decay Time and Offset Voltage.
However, beside Max and Min, today had to find the Average and Range values too. Thus, the data to be calculated is quite a lot. The picture below shows how I had organised the values but I am not suppose to reveal any company data. So the picture only shows the format without any data values.
After which, I have also calculated Max and Min values for the particle counts for the other areas to cut down the total number of charts to be created.
And finally, after so many days of calculating the Max and Min values for all the possible areas, the total number to charts we will be creating is 48 charts. From previously 191 charts, we had managed to cut down to 48 charts, I feel very satisfied. (^^)
Today, I had explored Microsoft Excel's Macro functions. I have created, using the Macros, buttons (after being clicked) that will link me to another worksheet. Although, they (the Macros that I have created) are not very useful, I still feel very satisfied.
Today is only Thursday but is the last working day of the week. I have realized the importance of public holiday now. Lol... (^^)
Wednesday, 24 October 2012
Week 2 - 24 Oct 2012 - Wed
Eighth day at SSMC.
Today, Miss Pascale showed me some database of SSMC's in the excel files and I was supposed to improve on the existing files using pivot tables and macros. However, we find that the two functions were not very useful and we were able to use certain formula to replace them for the same purposes.
However, using which formula is the problem I met today. I've tried using 'COUNTIF', 'SUMIF', 'IF', 'AND', 'HLOOKUP', and 'MATCH'. In the end, I solve the "mystery" using the 'COUNTIFS' formula.
Some FAILED formula examples:
=IF(Defect!$D:$D=AOQ!$A9,IF(Defect!$N:$N=AOQ!$B$3,IF(Defect!$O:$O=AOQ!$C$4,COUNTIF(Defect!$D:$D,$A(),0),0),0)
=AND(IF(Defect!D:D=AOQ!A17,1,0),IF(Defect!N:N=AOQ!B3,1,0))
=COUNTIF(Defect!D:D,(AND(IF(Defect!D3:D34=AOQ!A17,Defect!N:N=AOQ!D3,Defect!O:O=AOQ!B4),1,0)))
The Finally successful formula I had used to solve my problem today:
=COUNTIFS($A:$A,$E18,$B:$B,F$12,$C:$C,F$13)
Today, I have also found out the Max and Min values for some points and we were able to combine the areas into one chart. Thus, the total number of charts required has lowered to 111 charts.
Time flies?? Tomorrow is last day of work for this week... Hope that everything goes smoothly... (^^)
Today, Miss Pascale showed me some database of SSMC's in the excel files and I was supposed to improve on the existing files using pivot tables and macros. However, we find that the two functions were not very useful and we were able to use certain formula to replace them for the same purposes.
However, using which formula is the problem I met today. I've tried using 'COUNTIF', 'SUMIF', 'IF', 'AND', 'HLOOKUP', and 'MATCH'. In the end, I solve the "mystery" using the 'COUNTIFS' formula.
Some FAILED formula examples:
=IF(Defect!$D:$D=AOQ!$A9,IF(Defect!$N:$N=AOQ!$B$3,IF(Defect!$O:$O=AOQ!$C$4,COUNTIF(Defect!$D:$D,$A(),0),0),0)
=AND(IF(Defect!D:D=AOQ!A17,1,0),IF(Defect!N:N=AOQ!B3,1,0))
=COUNTIF(Defect!D:D,(AND(IF(Defect!D3:D34=AOQ!A17,Defect!N:N=AOQ!D3,Defect!O:O=AOQ!B4),1,0)))
The Finally successful formula I had used to solve my problem today:
=COUNTIFS($A:$A,$E18,$B:$B,F$12,$C:$C,F$13)
Today, I have also found out the Max and Min values for some points and we were able to combine the areas into one chart. Thus, the total number of charts required has lowered to 111 charts.
Time flies?? Tomorrow is last day of work for this week... Hope that everything goes smoothly... (^^)
Tuesday, 23 October 2012
Week 2 - 23 Oct 2012 - Tue
Seventh day at SSMC.
Today, on and off was using the computer to do work. And why did I say 'on and off'? Lol. It's because the computer was not working for some time. Thus, today had wasted some time doing nothing. >.< ( But, I did try to keep the slacking time to minimum by reading the handouts given. ;P)
I thought that I was going to do what I had mentioned in yesterday's post,that is, listing out the exact points for the ESD tests. However, just this morning, I realized that the points for the ESD tests were always randomly chosen. Hence, I (somehow) cut down my workload... XP
Yesterday, after listing out the points for the support areas, I found out that there were very little points in each area. After discussion with Miss Pascale, she had decided that if the maximum (Max) and the minimum (Min) value of the areas' data are within the similar range, then we are able to combine those areas into 1 chart. And this will cut down the number of charts to be created.
And so, I had, for the whole morning, been checking the Max and Min value for each area (using excel). It wasn't very hard, however, there were too many data. So in a way, it took me awhile to finish.
Meanwhile, after lunch, my computer broke down... Here comes my reading time. And in fact, I've been using electrostatic discharge (ESD) the term quite often but I had never known its exact meaning. So, reading is really good... Below are what I've learned today:
Electrostatic discharge (ESD) is the transfer or movement of charge between objects that are of different electrical potentials. It is caused by static electricity.
Static electricity is a stationary (non-moving) electrical charge and it is caused by imbalance of elctrons on the surface of materials.
Imbalance of electrons occurs when materials either lose or acquire electrons.
Some time in the afternoon, when my computer is back on track, I continued to do the same task for the ESD tests. Finding the Max and Min value for each area of each test. The ESD data were more then that of the support areas. I had a tedious afternoon to evening. Fortunate thing is, I manged to finish the ESD portion just before work ends.
I did not expect today to have so much things to say. Hope tomorrow will be better. This week is one short week. 2 more working days and break!! Friday, I'm so looking forward to you!!! (^^)
Today, on and off was using the computer to do work. And why did I say 'on and off'? Lol. It's because the computer was not working for some time. Thus, today had wasted some time doing nothing. >.< ( But, I did try to keep the slacking time to minimum by reading the handouts given. ;P)
I thought that I was going to do what I had mentioned in yesterday's post,that is, listing out the exact points for the ESD tests. However, just this morning, I realized that the points for the ESD tests were always randomly chosen. Hence, I (somehow) cut down my workload... XP
Yesterday, after listing out the points for the support areas, I found out that there were very little points in each area. After discussion with Miss Pascale, she had decided that if the maximum (Max) and the minimum (Min) value of the areas' data are within the similar range, then we are able to combine those areas into 1 chart. And this will cut down the number of charts to be created.
And so, I had, for the whole morning, been checking the Max and Min value for each area (using excel). It wasn't very hard, however, there were too many data. So in a way, it took me awhile to finish.
Meanwhile, after lunch, my computer broke down... Here comes my reading time. And in fact, I've been using electrostatic discharge (ESD) the term quite often but I had never known its exact meaning. So, reading is really good... Below are what I've learned today:
Electrostatic discharge (ESD) is the transfer or movement of charge between objects that are of different electrical potentials. It is caused by static electricity.
Static electricity is a stationary (non-moving) electrical charge and it is caused by imbalance of elctrons on the surface of materials.
Imbalance of electrons occurs when materials either lose or acquire electrons.
Some time in the afternoon, when my computer is back on track, I continued to do the same task for the ESD tests. Finding the Max and Min value for each area of each test. The ESD data were more then that of the support areas. I had a tedious afternoon to evening. Fortunate thing is, I manged to finish the ESD portion just before work ends.
I did not expect today to have so much things to say. Hope tomorrow will be better. This week is one short week. 2 more working days and break!! Friday, I'm so looking forward to you!!! (^^)
Monday, 22 October 2012
Week 2 - 22 Oct 2012 - Mon
First day of a new week, sixth day at SSMC.
Today, I did not do much things but the task that was given to me was enough for me to do for the whole day. Was it because that I'm too slow?
The task that I was assigned today was to check and confirm all the points of places for taking measurements for particle, air velocity and ionization.
Under the 3 main categories (particle, air velocity and ionization), there are places with many points for measurement to be taken. It could be in the same place but the exact points are different. And I have to check if the points are still in use as some points are either 'down' or 'shut off'. Some points are Thus, it took me the whole day to finish listing every point out.
Currently, I have estimated the total number of charts to be created is 191 charts. This includes particle, air velocity, ionization and 2 other measurements which are field voltage and electrostatic discharge (ESD) monitoring.
Tomorrow, I will be doing what I've done for today (listing out points for the measurements) for the ESD monitoring. And then I will have to think about how I will be setting up my Real Time Charts. I have the whole of this week to think about it and to try out the charts using another software as we will only have training on the SPC program on next Monday.
Today is such short and sweet. But is it a good thing? @.@
Today, I did not do much things but the task that was given to me was enough for me to do for the whole day. Was it because that I'm too slow?
The task that I was assigned today was to check and confirm all the points of places for taking measurements for particle, air velocity and ionization.
Under the 3 main categories (particle, air velocity and ionization), there are places with many points for measurement to be taken. It could be in the same place but the exact points are different. And I have to check if the points are still in use as some points are either 'down' or 'shut off'. Some points are Thus, it took me the whole day to finish listing every point out.
Currently, I have estimated the total number of charts to be created is 191 charts. This includes particle, air velocity, ionization and 2 other measurements which are field voltage and electrostatic discharge (ESD) monitoring.
Tomorrow, I will be doing what I've done for today (listing out points for the measurements) for the ESD monitoring. And then I will have to think about how I will be setting up my Real Time Charts. I have the whole of this week to think about it and to try out the charts using another software as we will only have training on the SPC program on next Monday.
Today is such short and sweet. But is it a good thing? @.@
Subscribe to:
Posts (Atom)

